Lean Manufacturing

Increase productivity. Minimize waste. Discover potential.

  • Critical analysis of heuristic production planning
  • Definition of a modified heuristic set of rules for the creation of optimized order sequences
  • Evaluation of existing critical influencing variables (bottleneck factors and restrictions) in the production control process as well as process and system reorganization
  • Introduction of a central production control center and
  • Introduction of advanced planning software for optimized order scheduling
  • Holistic replanning of a storage and transportation flow of RHBs
  • Optimization of the packaging process
  • ABCXYZ analysis and evaluation, as well as subsequent optimization and reduction of tied-up capital at RHBs
  • Plan/target/actual comparison of the material components and subsequent optimization of the kanban cycle and the number of material components
  • Planning and implementation of all process, system and organizational issues for successful first-time ISO 9001 implementation. Essentially: process analysis and further development, creation of QM documentation and implementation of the QM system in the organization
  • Introduction of an electronic planning board for production control and connection/introduction of machine data (PDA) to the planning board

Lay the foundation for more success

We enable you to make better decisions for your company with objective information and influencing factors.

Scroll to Top